Our pre drywall meeting went very well. The project manager is so well organized and knew everything about our house. Was very impressed with him! We only had a couple of requests and since the electricians were there, they made them right away.
First was the wiring for the chandelier in the dining room. I wanted it to be slightly off-center as we will have a piece of furniture on the side which will cause the table to be slightly off. Not a problem!
We only got a 2 piece rough-in for the bathroom in the basement. What we didn't realize was that meant the entire room would be drywalled over. There is no door! So while that was a surprise to us, we were able to get them to move the electrical wire up over where we will have to cut in a door. I take that as a bonus! haha.
So the drywall starts going in tomorrow and we are told they will start locking up our house this week. Things are moving along.
The pictures below are from before the pre drywall meeting as they show the rooms better. This weekend we will definitely have more with the drywall up!
Roof is on and the windows are in!
Door going from the garage into the mud room.
John's office
Front door
Sliding glass door
Looking from the kitchen through the great room and into the office.
Looking the opposite way... from the office, through the great room and the kitchen on the end.
Dining Room
Stairs to go to second level
Going down to the basement.
Basement door to outside
Basement - media room in the far back
John in doorway of media room
Stairs going up to main level from basement
Going upstairs to second level
Master bedroom
4th bedroom with decorative window
Stairs down to main level.
Back of house