First was the wiring for the chandelier in the dining room. I wanted it to be slightly off-center as we will have a piece of furniture on the side which will cause the table to be slightly off. Not a problem!
We only got a 2 piece rough-in for the bathroom in the basement. What we didn't realize was that meant the entire room would be drywalled over. There is no door! So while that was a surprise to us, we were able to get them to move the electrical wire up over where we will have to cut in a door. I take that as a bonus! haha.
So the drywall starts going in tomorrow and we are told they will start locking up our house this week. Things are moving along.
The pictures below are from before the pre drywall meeting as they show the rooms better. This weekend we will definitely have more with the drywall up!
Roof is on and the windows are in!
Looking from the kitchen through the great room and into the office.
Stairs to go to second level
Going down to the basement.
Basement - media room in the far back
Stairs down to main level.